Middle School
The middle school commons and main hallway received a much needed floor over winter break. The carpet, which was in place for nearly 20 years, was removed and replaced with a non-slip vinyl tile to match the lockers and walls. 

Staff was listening when students arrived on January 2nd and there is only one word to describe their reaction to the new look: Pride. 

If you’re in the building come in and check it out.